TransAT Tutorial Manual 6.1. Wall Boiling 6.1.9 Results Figure 6.7: Wallboiling: Phase 1 void fraction along an upward flowing pipe flow with subcooled boiling c Ascomp AG Switzerland 249 Version 5.7